Semiconductor fuses
                                                   Semiconductor (AC) fuses


                                                                 Protistor Square-body Fuses
                                                                                ®
                                                      PSC aR sizes 3x - 450V to 700 VAC
                                                                                                 Curves set






                                                                                                     Size 2x33

                                                                        Cut-off characteristics
                                                                      Below, right: Curves indicating for each rated
                                                                      current the peak value I that the current may
                                                                                              c
                                                                      reach as a function of the prospective fault
                                                                      current I .
                                                                              p































                                                                   Time-current characteristics
                        Size
                                                                 Above, left: Curves indicating pre-arcing time for
                      2 x 33
                                                                 each rated current as a function of RMS value of
                                                                 pre-arcing current I.
                                                                 - Tolerances on this current ± 8 %.
                                                                 - Beyond 30 sec or 10 sec, small overloads must be
                                                                 eliminated by another device.
                                                                 - Curve CC’ represents the maximum times taken by
                                                                 the associated device to clear small overloads; only
                                                                 its horizontal line is represented. Its oblique line
                                                                 must be plotted according to sketch, top right
                                                                 corner.
                                                                 - The intersection of the fuse and CC’ curves
                                                                 indicates the minimum breaking current Ipm of the
                                                                 fuse.


                                                                   Maximum values of total
                                                                                2
                                                                 operating I t and total operating
                                                                 times
                                                                 Left: Horizontal curves indicating the maximum
                                                                                            2
                                                                                         2
                                                                 values of total operating I t (I t ) as function of
                                                                                             t
                                                                 the prospective current I at 660 V, cos ϕ = 0.15.
                                                                                        p
                                                                 The oblique lines indicate the corresponding total
                                                                 operating time T , with pre-arcing time in brackets.
                                                                                t