Page 557 - V16 Catalogue Final
P. 557

TEST TERMINAL BLOCKS




                                             3 PHASE kWh METER TEST TERMINALS                    0.25mm² - 6mm²
                                             STANDARD ‘GREY’ COLOUR SCREW CLAMP

                                              Description                                         Part No.
                                              Conductor cross section stranded. 0.2 - 6.0mm²      CDS6U-KIT3P
                                              Dimensions (L x W x H), 82 x 81.5 x 60mm
                                              Marking tag: K8 size
                                              3 CT Kit
                                             - Kit does not include end stops (CA202) or the mounting rail.        WIRING
                                                                                                                  TERMINALS

                                              Description                                        Part No.
                                              Conductor cross section stranded. 0.2 - 6.0mm²     CDS6U-KIT3P-4CT
                                              Dimensions (L x W x H), 82 x 100 x 60mm
                                              Marking tag: K8 size
                                              4 CT Kit
                                             - Kit does not include end stops (CA202) or the mounting rail.
                    CDS6U-KIT3P


                                             TEST TERMINAL INSTRUCTIONS

                                             Meter test for L1 through external power supply

                                               Sequence for test:
                                               1 - Close short circuit slide of terminals 1 and 2.
                                               2 - Open disconnect link of terminal 2 and 7.
                                               3 - Connect external power supply to test socket of terminals 1, 2 and 7, 10.


                                  Closing of SLS2





                                             Comparison measurement for L1

        A                      V               Sequence for test:
                                               1 - Remove shorting link screw from terminal 2.
                                               2 - Connect ammeter to test sockets of terminal 2.
                                               3 - Open disconnect link of terminal 2.
                                               4 - Connect voltmeter to test sockets of terminals 7 and 10.


                                SLS2 in open condition







                                             Changing the meter for L1
                                               Sequence for test:
                                               Close short circuit slide of terminals 1 and 2.
                                               Open disconnect link of terminal 2 and 7.
                                               Disconnect meter for L1 at terminals 1, 2, 7 and 10.




                                 Closing of SLS2





        Phone: 1300 556 601                            www.ipd.com.au                                V16-IA-WT-R02  549
   552   553   554   555   556   557   558   559   560   561   562