Page 805 - IPD Product Catalog V17
P. 805

Wiring Terminals



        TEST TERMINAL BLOCKS


                                               3 PHASE kWh METER TEST TERMINALS - 6mm²
                                               SCREW CLAMP
                                                Description                                        Part No.
                                                Conductor Cross Section Stranded. 0.2 - 6.0mm²
                                                Dimensions (L x W x H), 82 x 81.5 x 60mm
                                                Standard “Grey” Colour                             CDS6U-KIT3P
                                                Marking Tag - K8 Size
                                                3 CT Kit
                                               -  Kit does not include end stops (CA202) or the mounting rail
                                                Description                                        Part No.
                                                Conductor Cross Section Stranded. 0.2 - 6.0mm²
                                                Dimensions (L x W x H), 82 x 100 x 60mm
                                                Standard “Grey” Colour                             CDS6U-KIT3P-4CT
                                                Marking Tag - K8 Size
                      CDS6U-KIT3P               4 CT Kit
                                               -  Kit does not include end stops (CA202) or the mounting rail




                                               TEST TERMINAL INSTRUCTIONS

                                               Meter Test for L1 Through External Power Supply
                                                Sequence for test:
                                                 1 - Close short circuit slide of terminals 1 and 2
                                                 2 - Open disconnect link of terminal 2 and 7
                                                 3 - Connect external power supply to test socket of terminals 1, 2 and 7, 10





                                 Closing of SLS2


                                               Comparison measurement for L1
                                                Sequence for test:
                                                 1 - Remove shorting link screw from terminal 2
                                                 2 - Connect ammeter to test sockets of terminal 2
                                                 3 - Open disconnect link of terminal 2
           A                   V
                                                 4 - Connect voltmeter to test sockets of terminals 7 and 10




                                  SLS2 in open
                                  condition



                                               Changing the meter for L1
                                                Sequence for test:                                                  8
                                                 1 - Close short circuit slide of terminals 1 and 2
                                                 2 - Open disconnect link of terminal 2 and 7
                                                 3 - Disconnect meter for L1 at terminals 1, 2, 7 and 10







                                Closing of SLS2