DEHN Risk Tool: Focus on
            cost-effectiveness



            Correct interpretation of the result             Selection of measures in the DEHN Risk Tool
            Each risk to be considered is displayed in a different colour.    Measures can be defined with the help of a selection
            Blue stands for the tolerable risk, red or green for the risk   matrix. These measures are displayed according to the risk
            calculated for the structure to be protected.    components selected.

                                                             Cost-effectiveness of protection measures
                 Without measures         With measures      Building owners are often faced with the question which
             RT                     RT                       damage can occur as a result of lightning effects and how
             R1       25238 %       R1    61 %
                                                             high costs for protection measures should be with regard to
                  2,52E-03     1E-5      6,14E-06     1E-5   the value of the building. Therefore, economic aspects are
                                                             an important decision criterion. The risk analysis as per IEC
            Determination of the potential risks             62305-2 integrated in the DEHN Risk Tool software provides
            The risk components describe the potential risks for   a selection aid.
            a structure. Therefore, the risk components must be
            considered in detail when performing a risk analysis. The
            aim of a risk analysis is to reduce the main risks by taking
            reasonable measures.

            Determination of the main risks
            Each risk component can be reduced or increased by
            different parameters.