Page 10 - Evolution Distributionboard Technical Catalogue
P. 10

VERIFICATION






                                                          DESIGN VERIFICATION
                                                          (Clause 10 of AS/NZS 61439.1)

                                                        • Verifies compliance of the design using three verification options.
                                                        • Is intended to verify compliance of the design of an Assembly with
                                                           the requirements of the standards.
                                                        • Includes Constructional Requirements and Performance
                                                           requirements.


                                                          ROUTINE VERIFICATION

                                                          (Clause 11 of AS/NZS 61439.1)
                                                        • Checks whether Design Verifications are available where
                                                           appropriate.
                                                        • Is intended to verify compliance of the design of an Assembly
                                                           with the requirements of the standards.
                                                        • Includes Constructional Requirements and Performance
                                                           requirements.












          DESIGN VERIFICATION – THREE METHODS
         (Refer table D.1)




                                                        1. Verification by testing
                                                           The requirements of the standard are proved by testing.

                                                        2. Verification by comparison with a tested
                                                            most onerous design
                                                           Most requirements would fall under this category. This involves
                                                           verification by comparing the application design with tested
                                                           arrangements.

                                                        3. Verification by assessment
                                                           This method allows verification by the application of calculations and
                                                           design rules. Limits and strict conditions apply which include
                                                           appropriate safety margins.













        Evolution Distribution Boards-V3
        8                                             www.ipd.com.au                            Phone: 1300 556 601
   5   6   7   8   9   10   11   12   13   14   15