SOFT WARE FUNCTIONS                                                              4/13





















                           Ekip Power Controller, which can be used with all  —
                           Ekip Touch trip units of the Emax 2 series, effec-
                           tively helps to improve energy efficiency by man-  The exclusive Power Controller
                           aging the entire low-voltage electrical system. It  function available on the new
                           is, in fact, able to adapt the demand for power ac-
                           cording to the availability of the energy source,  Emax 2 units monitors the power,         04
                           the time of day and the costs indicated in the cur-  keeping it below the limit set by
                           rent pricing plan.
                           In this way Ekip Power Controller is able to main-  the user. As a result of this more
                           tain power consumption within the limits de-  effective use, the peak of power
                           fined, thereby optimizing the costs of managing
                           the installation and reducing emissions.    consumed can be limited allowing
                                                                       savings on electricity bills.
                           The command sent to the downstream devices
                           can be performed in two different ways:     The Power Controller, patented by ABB, discon-
                           •  through the wired solution, by commanding the   nects non-priority utilities, such as electric car
                            shunt opening/closing releases or acting on the   charging stations, lighting or refrigeration units,
                            motor operators of the loads to be managed;  during the times when consumption limits need to
                           •  through a dedicated communication system.  be respected, and connects them again as soon as
                                                                       it is appropriate. When required, it automatically
                           The ability to control the loads according to a list   activates auxiliary power supplies such as genera-
                           of priorities already defined provides significant   tor sets. No other supervision and control system
                           advantages from both economic as well as tech-  is required: it is sufficient to set the required load
                           nical points of view:                       limit on Emax 2, which can control any switching
                           •  economical: energy consumption optimization   device located downstream, even if it is not
                            is focused  on the control of the costs linked in   equipped with a measurement function.
                            particular to the penalties that are levied when
                            the contractual power is exceeded  or when the   Application examples
                            contractual power is increased by the Distribu-  Electricity bill savings, demand response, avoiding
                            tion  System Operator (DSO) as a consequence   power overload are the typical scenarios where
                            of exceeding the limit repeatedly.         Power Controller is adopted.
                           •  technical: the possibility of power absorption   As it operates on not critical loads, it is common of
                            over the contractual limits for shorter periods   office building, shopping malls, hotels, campuses,
                            and, as well as, the  management and the con-  waste and water industries or every plant that
                            trol of the power consumption over long peri-  works like a low voltage microgrid.
                            ods of time. Thus it is possible to reduce the
                            likelihood of malfunctioning due to overloads,
                            or worse, complete inefficiency of the entire
                            plant due to tripping ofthe LV main switching
                            device.