Page 98 - Sace Emax 2 Catalogue
P. 98
5/20 SACE EMAX 2 LOW VOLTAGE AIR CIRCUIT-BREAKERS
—
Energy Measurements
Class 1 accuracy
— With the Ekip Touch trip units, measurements of
power and energy to a IEC 61557-12 Standard
With the Ekip Touch trip units the compliant, Class 1 level of accuracy, are guaran-
embedded measurement teed by the embedded measurement functional-
ities. Thus, there is no need for additional de-
functionalities allow the vices, with consequent advantages in terms of
measurement of power and cost savings, space reduction and installation
time optimization.
energy to a Class 1 degree of When energy needs monitoring, even a minimal
accuracy, as specified by the IEC percentage of errors would result in a waste of
money. Accuracy is everything and depends on the
61557-12 Standard, avoiding the design and manufacturing quality of solution used.
need of additional device saving SACE Emax 2 with Ekip Touch trip units guarantee
1% accuracy for power and energy monitoring.
costs, space and installation time.
Thanks to the extremely accurate Rogowsky coil, requirements to be met with ease.
ABB Ekip Touch trip units are able to guarantee Measurement data can be displayed in several ways:
Class 0.5 for voltage and current measurements • On the embedded display on the trip unit
and Class 1 for active power and energy measure- • On a smartphone via Bluetooth (EPiC mobile
ments, complying with and certified by the app)
IEC 61557-12 Standard. • Using the Ekip Connect software on a PC
IEC 61557-12 can be applied to both AC and DC • On an Ekip Multimeter external display
electrical networks up to 1000 V AC or 1500V DC. • On a cloud-platform thanks to ABB Ability™
Moreover, an upgrade of the device is always Energy and Asset Manager
guaranteed to be quick and easy: the measure- • In the supervision system (ex SCADA) thanks to
ment functions not included in an installed trip several communication protocols
unit can be downloaded directly from the Market- • On the control panel display.
Place via EPiC mobile app, thus allowing new system