Page 17 - MCCB-XT2-XT4
P. 17
ABB | SACE Tmax XT
Management operations
Life cycle The following operations are required to ensure that SACE Tmax XT functions correctly:
Reception Installation Commissioning Maintenance Disposal
Figure 7
Operation Description
Reception Unpacking and inspection of materials received
Installation Assembly operations
Putting into service General pre-ignition inspections
Routine inspections and cleaning, management of alarms
Maintenance and faults
or faults
Decommissioning EOL treatment and disposal
This document describes the Putting into service and Maintenance and faults operations for Ekip Touch;
consult the Installation Instructions and Technical catalog for the other operations (references on page 4).
1 - Putting into service
General checks Perform the following inspections before putting into service:
Points to be
checked Checks
Earth connections
Main
connections If required, connection of supply source by means of terminal box
If present, connection of Ekip Supply supply/module
If Ekip Touch is not on, connect an external supply device (example: Ekip TT) to the
Alarm
Trip unit and make sure there are no alarms present (details on page 18).
Parameters Configure all the parameters of the unit as required
15 | © 2022 ABB | 1SDH002031A1002 - ECN000212994 Management operations | 1 - Putting into service