Page 147 - dehn-catalogue-safety-equipment_0
P. 147

Service and Safety
           Service and Safety

           Periodic Testing of Safety Devices at DEHN
           Maintenance Test
           Only tested devices protect your life
           •  Regular maintenance tests ensure that your devices are in a
            good order and condition
           •  Maintenance tests in DEHN’s high-voltage test laboratory for
            operating and earthing sticks, voltage detectors, phase com-
            parators, devices for voltage detecting systems, earthing and
            short-circuiting devices
           •  Test is documented on the device and in a separate test report





                                                                One of our high-voltage laboratories.






                                                                Contact
            Voltage Detector Retest > 1 kV to IEC/EN 61243-1

                                                                Fa. DEHN Standort 2

            Test Report No.:   PHEC 005856 20131002             Service-Center Retouren

                                                                Am Ludwigskanal 1
            DETAILED INFORMATION ON THE UNIT                    92360 Mühlhausen
            Voltage detector type:   PHE III   Nominal voltage:   20KV   E-Mail: [email protected]
            Art.-No.:  767720   Man.-No.:   005856   Year of man.:   2007
            Test prod type:   767761   Man.-No.:   007051   Year of man.:   2007
            Insulating rod type:   766009   Man.-No.:   010168   Year of man.:   2007
            Last retest made (accord. to type label):
            Notes:   repeat examination
            Customer:   John Doe
                  12345 Any City, Any Street 1
            Goods receipt No.:   37630   dated:   16.06.2013

            TEST IN ACCORDANCE WITH DIN VDE 0682 TEIL 411
            1. Test by visual inspection   2. Test by handling
            a)  Orderly State    yes    no  a)  Individual parts locked against
            b)  Mechanical damage    yes    no   unintentional loosening    yes    no
            c)  Arcing or leakage current effects    yes    no   b)  Hand guard and red ring are solidly fitted    yes    no
            d)  Instructions for Use    yes    no  3. Test by measurement
            e)  Unit complete    yes    no  a)  Length of insulating piece as determined    yes     no
            f)  Markings readable    yes    no  b)  Length of extension piece as determined    yes    no
            g)  Construction visible    yes    no  4. Test on discharge current
            h)  Red ring visible and present    yes    no      Discharge current below 0,2 mA    yes    no
            i)  Hollow parts closed    yes    no
            k)  Degree of protection of indicator given    5. Test on short-circuit withstand
               (visual inspection of enclosure sealings)    yes    no     Short-circuits or disruptive discharges    yes    no
            l)  Active indication signals    yes    no  6. Test for clear indication
            m) Self-test unit ready for operation    yes    no  a)  Clear indication
                                                       yes    no
                                   b)  Clear perceptibility of visual indication    yes    no
                                   c)  Clear perceptibility of acoustic indication    yes    no

            ADDITIONAL NOTES
                                               The  test  was  made  with  equipment,  the
            Report number PHEC 005856 20131002   measurement standards of which base on the
                                               standards of the Physical     and     Technical
                                               Federal Institute of Brunswick and Berlin (PTB)
            9 Volt battery changed.            directly  resp.  indirectly  via  a  German
                                               calibration facility.



            ALL TESTED CHARACTERISTICS COMPLY WITH THE ABOVE
            MENTIONED STANDARD. THE MAINTENANCE TEST WAS PASSED    yes    no
            SUCCESSFULLY AND WAS MARKED ON THE RATING PLATE:

                                               5  kV  AC-Measuring-System  D-K-15086-01-00-11018
            Marks:   2013     Next maintenance test:   2019   35  kV  AC-Measuring-System  DKD-K-24501-4252
                                                kV
                                               50
                                                       DKD-K-15901-373
                                                 AC-Measuring-System
                                               300 kV AC-Measuring-System DKD-K-24501-4251



            NEUMARKT,    07.10.2013 -  Meier Robert
                                          Signature of Quality Management


            DEHN + SÖHNE   92318 Neumarkt/OPf.   www.dehn.de
            GmbH + Co. KG.   Postfach 16 40   Tel.: 0 91 81/9 06-0
            Hans-Dehn-Str. 1   92306 Neumarkt/OPf.   Fax: 0 91 81/9 06-1100   DF63F57A.doc       DEHN form No.: WPR_PHEIII_IEC_DD_ab BJ2006_englisch.dot
                                                                                                                      Service and Safety
           Valid as of January 1, 2019                       You will find detailed product information on our website   145
   142   143   144   145   146   147   148   149   150   151   152