           Circuit breaker racking-in/ The following is the procedure for the insertion of the moving part in the fixed part:
              racking-out operations
                                           WARNING!
                                            •  Make sure the circuit-breaker is disconnected from all sources of energy.
                                            •  Switch the circuit-breaker to the open position with springs discharged.
                                           WARNING! Before proceeding, remove all equipment used during the work and remove
                                               processing waste and materials used.
                                      1.  Turn plate through 90° before inserting the moving part.

                                                                        “CLICK”













                                    Figure 52

                                      2.  Make sure that signalling device on the fixed part indicates the DISCONNECT position. See Figure
                                         53.
















                                    Figure 53

                                      3.  Position the moving part in the fixed part and push until it comes to a stop. See Figure 54 and Figure
                                         55.



















                                    Figure 54                      Figure 55