Page 167 - Sace Emax 2 Manual for design engineers
P. 167
ABB | SACE Emax 2
4 - Installation
Overall Dimensions E1.2 Information on the overall dimensions is available on the website:
http://www.abb.com/abblibrary/DownloadCenter/.
The following drawings are also available in .dxf format:
• 1SDH000999r0101 - E1.2 III-IV Fixed F EF IEC-UL
• 1SDH000999r0102 - E1.2 III-IV Fixed FC IEC-UL
• 1SDH000999r0103 - E1.2 III-IV Withdrawable EF IEC-UL
• 1SDH000999r0104 - E1.2 III-IV Withdrawable ES IEC-UL
• 1SDH000999r0105 - E1.2 III-IV Withdrawable SHR IEC
• 1SDH000999r0106 - E1.2 III-IV Withdrawable FC IEC
• 1SDH000999r0107 - E1.2 III-IV Fixed HR-VR Positionable IEC
• 1SDH000999r0108 - E1.2 III-IV Fixed ES IEC-UL
• 1SDH000999r0109 - E1.2 III-IV Withdrawable HR-VR IEC
• 1SDH000999r0120 - E1.2 Flange Fixed Withdrawable IEC-UL
• 1SDH000999r0121 - E1.2 Floor mounting IEC-UL
• 1SDH000999r0303 - E1.2 III-IV Withdrawable Rear Terminals HR-VR UL
• 1SDH000999r0307 - E1.2 III-IV Fixed Rear Terminals HR-VR UL
Positioning anchor plates E1.2 The following diagram shows the distance for positioning the first anchor plate for E1.2 circuit-breakers
according to the peak current:
500/
19.69
450/ L L
17.72
400/
15.75
350/
13.78
L L
300/
11.81
250/
9.84
200/
7.87
150/
5.91
L L
100/
3.94
40 60 80 100 120 140 160
Figure 103
(1): distance of the first anchor plate from the circuit-breaker terminals
(2): peak current
165 | © 2020 ABB | 1SDH001330R1002 - ECN000134959 - Rev. A Mechanical characteristics | 4 - Installation