Page 14 - Assembly Instructions Manual
P. 14
These holders are available
with Alu-zink frames for bus-
bars up to 3200 Amps, and in
stainless steel frames for
busbars 3200-5000 Amps.
Due to the eddy currents,
avoid mild steel parts within
80mm distance of busbars
(above 3200 Amps)
Bolt quality 8.8
1. Place the two rails in the approximate center of the panel (consider the
connection from the ACB) and place the bottom plate.
2. With the bottom plate in the right position the stack the busbars.
3. Bolt the top plate and retighten all the bolts with 10Nm.
09 ISSUED BY: F. P DATE: 01.10.2007 APPROVED BY: A. K DATE: 01.10.2007 REPLACES: 01.04.2005