Page 38 - Assembly Instructions Manual
P. 38

The units are delivered fully assembled as
                                                                       shown in this picture.
                                                                       Please follow the assembly sequence starting
                                                                       with 1.


                                    FRONT VIEW








                Power plugs rated up to 80 amps
                are available.



                                                                                            BACK VIEW













                                                                1.  Mount the back conduit holder profile
                                                                   and side PC holder profile as shown in
                                                                   pic:1 and the conduit between the two
                                                                   rails.



















                                                                 2. Knockout the slot on the outer casing
                                                                    on the side that faces the cable
                                                                    chamber.



                                                                 3. Insert the outer casing and fix it with
                                                                    screws.




                32      ISSUED BY: F. P DATE: 01.10.2007 APPROVED BY: A. K  DATE: 01.10.2007 REPLACES: 01.04.2005
   33   34   35   36   37   38   39   40   41   42   43