Page 402 - 35_DS702_E_2014_Lightning_Protection_Guide
P. 402
Service station It depends on the building size whether further surge protec-
Lightning equipotential bonding has to be implemented at the tion measures are necessary for the internal conductors up-
entry point into the service station for the pressurised water stream of the corresponding control systems (Figure 9.23.5).
pipe, the two-wire ring conductor, the IT and the power supply
feeder cable and the pump line. The described practical solutions are just examples. Lightning
and surge protection have to be individually adjusted to the
natural and structural conditions.
www.dehn-international.com LIGHTNING PROTECTION GUIDE 401