Page 402 - 35_DS702_E_2014_Lightning_Protection_Guide
P. 402

Service station                              It depends on the building size whether further surge protec-
       Lightning equipotential bonding has to be implemented at the   tion measures are necessary for the internal conductors up-
       entry point into the service station for the pressurised water   stream of the corresponding control systems (Figure 9.23.5).
       pipe, the two-wire ring conductor, the IT and the power supply
       feeder cable and the pump line.              The described practical solutions are just examples. Lightning
                                                    and surge protection have to be individually adjusted to the
                                                    natural and structural conditions.

































































            www.dehn-international.com                             LIGHTNING PROTECTION GUIDE  401
   397   398   399   400   401   402   403   404   405   406   407