Page 63 - Sace Emax 2 Catalogue
P. 63

PROTECTION TRIP UNITS                                                            3/39



















                                                                                                                       03
                           Residual overvoltage (RV – ANSI 59N): with constant trip time (t = k), protects against insulation loss in
                2
                           systems with insulated neutral or with neutral earthed with impedance.
            V23    V12
                α
                  α
           3    V31  1




                           Loss of field or reverse reactive power (RQ – ANSI 40 or 32RQ): with constant trip time (t = k), the cir-
          Q
                           cuit breaker tripped when the total reactive power absorbed by the generator exceeds the set thresh-
                           old. It is possible to select the constant threshold (k=0) or a function of the delivered active power of
                      P
                           the generator (k≠0).
                TRIP




                           Reactive overpower (OQ – ANSI 32OF): with constant trip time (t = k), the function is tripped when re-
          t
                           active power exceeds the set threshold in the generator to network direction.
             Q27

                   t27
                      Q


                           Active overpower (OP – ANSI 32OF): with constant trip time (t = k), the function is tripped when the ac-
          t
                           tive power exceeds the threshold set in the delivering direction of the generator.
             P26

                   t26
                      P


                           Active underpower (UP – ANSI 32LF): with constant trip time (t = k), the function is tripped when the
          t
                           active power delivered by the generator is lower than the set threshold. It is possible to disable the pro-
                           tection temporarily, to manage the start-up phase, by setting a time window from the closing of the
                  P23
                           circuit breaker, by using an electrical signal or via incoming communication to a relay.
             t23
                      P
   58   59   60   61   62   63   64   65   66   67   68