Page 68 - Sace Emax 2 Catalogue
P. 68

4/4              SACE EMA X 2 LOW VOLTAGE AIR CIRCUIT-BRE AKERS



          —

          Adaptive Protections








          Emax 2 adds dual setting capability to switching device to
          ensure continuous coordination

                           Purpose                                     Application example
                           User’s plants can work as a LV Microgrid thanks   We have a plant connected to the MV Utility by
                           to the energy produced by renewable and local   means of a MV/LV transformer. If the Utility shuts
                           power sources, in particular as a consequence of   down, the plant will become a Microgrid supplied
                           lacking of the Utility power supply, e.g. due to a   by the local generator G, which will feed the prior-
                           fault on the MV voltage side. In order to still guar-  ity loads by using the loads shedding feature of
                           antee a high level of selectivity and continuity of   Emax 2.
                           service, it is important to take into account the   In grid-connected condition, the generator G is
                           variation of the short circuit power when moving   disconnected. With reference to fig.1:
                           from. Indeed, during grid connected condition   •  Circuit breaker A is closed
                           the fault current on a microgrid feeder is supplied   •  Circuit breaker B is open
                           by the Utility, so it is higher than the one supplied   •  Circuit breakers C are closed. The protections of
                           only by the local generation during islanded con-  the one that supplies loads D are upgraded us-
                           dition.                                      ing "Set A" of Emax 2 unit.
                           As a result, it is desirable that the several protec-  •  Circuit breakers D are closed
                           tion thresholds of the units can be automatically   •  Circuit breaker E is closed
                           changed during the transition to the islanding   •  Circuit breaker QS1 is closed
                           condition.                                  •  All loads supplied.
                                                                       The circuit breakers C are selectively coordinated
                                                                       with the upstream main circuit breaker A, sup-
                                                                       plied by the Utility, and the downstream load cir-
                                                                       cuit breakers D (fig. 2).
                                                   U





                                                                                 G


                                              A                             B







                               E                                   C               C               C






                              non priority loads
                                                                          QS1


                                                       D           D            D



                           —
                           Fig. 1
   63   64   65   66   67   68   69   70   71   72   73