Page 67 - Sace Emax 2 Catalogue
P. 67

SOFT WARE FUNCTIONS                                                           4/3





























                           In order to maximize the service continuity, local   When the main grid comes back stable, thanks to   04
                           generation starts to supply the islanded User’s   Synchrocheck logics, manages the plant voltage
                           plant. Emax 2 is the first circuit breaker able to in-  and frequency to reconnect it. in grid-connected
                           tegrate in one device protection features and Au-  operation, Emax 2 manages the Power Controller
                           tomatic Transfer Switching (ATS) programmable   algorithm to shave peaks and shift loads in order
                           logics. This unique integrated solution avoids the   to optimize system performance and productivity.
                           usage of other external control unit, guaranteeing   Emax 2 advanced features are easily customized
                           switchgear footprint and commissioning time   thanks to commissioning software tools which do
                           saving.                                     not require high level engineering competencies.
                           Strong reduction of wiring connection simplify   Ready to use templates enable the download of all
                           the installation and commissioning phase.   the logics directly into the trip unit. The solutions
                           The Load Shedding embedded algorithm is able   become plug & play, increasing modularization and
                           to manage power system for the comprehensive   standardization for design and installation.
                           microgrid energy management.                Here following the description of the several
                           Before the transfer from the main grid to local   Adanced functionalities wich have been devel-
                           line, selected loads are shed to support power   oped and integrated in Emax 2 follows the below
                           balance. Emax 2 using slope of frequency discon-  compatibility table.
                           nects loads only in case of emergency unbalance
                           condition.


                                                 Load            Automatic       Synchrocheck logics  Power
                                                 Shedding        Transfer Switch                 Controller
                           Load Shedding
                           Automatic Transfer Switch
                           Synchrocheck logics
                           Power Controller
   62   63   64   65   66   67   68   69   70   71   72