Page 142 - Sace Emax 2 Manual for design engineers
P. 142

ABB | SACE Emax 2
       2 - Load Shedding



                        Description The Load Shedding function allows faults to be managed in installations which are able to function thanks
                                    to the energy produced by renewable and local energy sources, especially the absence of power supply
                                    caused, for example, by a fault on the MV voltage side.
                                    This function is available in two versions:
                                     •  Basic, supplied with all the Ekip Touch Trip units
                                     •  Adaptive; can be purchased by means of the relative additional package and is available for all Trip units
                                       with the Measuring Measurements package
                                    All the parameters and measurements of the function are available via Ekip Connect; however, the Trip unit
                                    allows certain of them to be set and displayed, as described below.
                                           IMPORTANT: consult the Technical catalog or White paper of the function for full
                                               details (page 13, 16).


               Ekip Touch Parameter Certain configuration parameters of the function are available in the Settings - Load Shedding menu (page46).

                                           NOTE: it is advisable to first configure the parameters via Ekip Connect, and only then operate
                                               on the Trip unit

                                     Parameter       Description                                             Default
                                     Enable         Activates/deactivates the function and its availability in the parameters menu Off
                                                    Display of the version of the function, Basic or Adaptive
                                     Version             NOTE: with the Basic version, the only parameter available is   --
                                                        Reconnection Timeout
                                     Solar Plant present  Establishes whether the microgrid includes a solar energy system (Off/On)  Off
                                                    Available with Solar Energy System Present = On, defines the rated power of
                                     SolarPlant     its solar energy system.
                                     NominalPower   The value is given in kW and can be set within the range: 100 kW to 65535   100 kW
                                                    kW, in 1 kW steps
                                     ATS            Establishes whether the installation has an ATS system (Off/On)  Off
                                                    Available with ATS=On, defines the power received from the ATS branch;
                                     Generator Power                                                         . . . .
                                                    can be set within the range: 0 kW (. . . .) to 10000 kW, in 1 kW steps
                                                    Defines the instantaneous frequency variation that activates Load shedding
                                     Frequency slope  The value is given as absolute value (Hz/s) and can be set within the range:  0,6 Hz/s
                                                    0.6 Hz/s to 10 Hz/s in 0.2 Hz/s steps
                                                    Control threshold of the minimum frequency that activates Load shedding
                                     F W Warning   (1)  The value is given as absolute value (Hertz) and can be set within the range:  3 Fn
                                                    0.9 Fn to 1.1 Fn in 0.001 Fn steps
                                                    Defines the time employed by the Trip unit between reconnection of one load
                                     Reconnection   and the next, after the main CB has reclosed. The value is given as absolute  10 s
                                     Timeout
                                                    value (s) and can be set within the range: 1 s ÷ 1800 s, in 1 s steps

                                           NOTE: Load shedding activates if the monitoring conditions defined by the Frequency slope
                                               and F W Warning parameters are present at the same time
























       140 | © 2020 ABB |  1SDH001330R1002 - ECN000134959 - Rev. A                  Ekip Touch - Additional functions | 2 - Load Shedding