Page 144 - SACE Tmax XT - Catalogue
P. 144

6/10             SACE TMAX XT LOW VOLTAGE MOLDED CASE CIRCUIT-BREAKERS



          —

          Load Shedding













                           Space saving                                    - The Load Shedding algorithm is self-tuned
                           •  No other programmable logic controllers (PLCs)   with specific power unbalance identification
                            are needed as the Tmax XT has embedded intelli-  and dynamically chooses the controllable
                            gence for the load shedding logics, taking ad-  loads to be shed, reducing constraints for
                            vantage of the current and voltage sensors for   consultants during plant design.
                            electrical parameter measurements.             - The ATS unit only manages two sources, with-
                           •  In addition, static converters for low voltage   out interlock, logic programming or wiring
                            photovoltaic production typically have anti-   connections for the third circuit-breaker with
                            islanding protection: this implies another power   less time required for installation.
                            deficit to be added to the main grid contribu-
                            tion during the microgrid islanding. The Tmax   Ease of use
                            XT estimates solar production without addi-  Load shedding logic is generally set using top en-
                            tional sensors.                            gineering skills and customization efforts with
                           •  The Load Shedding algorithm is suitable with   devices as programmable logic controllers.
                            ATS architectures to distinguish priority and   The Tmax XT guarantees easy installation thanks
                            non-priority loads.                        to predefined templates and the user-friendly
                            Where feasible, a BusTie switching device is no   graphic interface in the software commissioning
                            longer required and this means:            tool.
                               - Significant space and material savings of up
                              to 50% in the power distribution switchgear
                              for panel builders.





          —
          Typical
          Load Shedding
          application



                                Gen                                                            PV
                                 Set                                                          Plant



                                                                                                 –





                              LINE 1  OFFICES                 LINE 2                   WAREHOUSE      POWER
                                                                                                      FACTOR
                                                                                                      CORRECTION









                                                M     M     M
                                               3     3     3
                                            ASYNCHRONOUS MOTOR  LIGHTING  SOCKET  LIGHTING   HVAC
   139   140   141   142   143   144   145   146   147   148   149