Page 19 - MCCB-XT5
P. 19

ABB | SACE Tmax XT
        Management operations




                          Life cycle The following operations are required to ensure that SACE Tmax XT functions correctly:








                                         Reception     Installation  Commissioning  Maintenance  Disposal

                                    Figure 9


                                     Operation                      Description
                                     Reception                      Unpacking and inspection of materials received
                                     Installation                   Assembly operations
                                     Putting into service           General pre-ignition inspections
                                                                    Routine inspections and cleaning, management of alarms
                                     Maintenance and faults
                                                                    or faults
                                     Decommissioning                EOL treatment and disposal

                                    This document describes the Putting into service and Maintenance and faults operations for Ekip Touch;
                                    consult the Installation Instructions and Technical catalog for the other operations (references on page 4).





       1 - Putting into service


                            Wizard When  powered  up,  Ekip  UP  displays  the  Wizard  window,  a  user-friendly  procedure  for  immediate
                                    adjustment of certain parameters: language, date, time, voltage of the installation, PIN (and RELT Wizard
                                    if RELT - Ekip Signalling 2K-3 module is present).
                                    After the procedure has terminated, the window will no longer appear unless it is reset via Ekip Connect
                                    by the Reset Wizard command: in this case, Wizard will appear when the apparatus is powered up the
                                    next time.
                                           NOTE: for security reasons, ABB strongly advises you to change the PIN right from the first
                                           access and to keep it in a safe place



                     General checks Perform the following inspections before putting into service:
                                     Points to be
                                     checked    Checks
                                                Earth connections
                                     Main
                                     connections  If present, connection and tightening to external voltage tap offs (V0)
                                                If present, connection of Ekip Supply supply/module
                                                If Ekip Touch is not on, connect an external supply device (example: Ekip TT) to the
                                     Alarm
                                                Trip unit and make sure there are no alarms present (details on page 19).
                                     Parameters  Configure all the parameters of the unit as required














       17 | © 2022 ABB |  1SDH002039A1002 - ECN000212994                      Management operations | 1 - Putting into service