Page 483 - 35_DS702_E_2014_Lightning_Protection_Guide
P. 483

F. Index



          A                                            C
          Acceptance test  56, 57                      Cable cross-section  356
          Accessible roofs  82                         Cable duct systems  262
          actiVsense  371, 383                         Cable network  292
          Additional inspection  56, 57                Cable protection fuse  242
          ADSL connection  336                         Cable shielding  169, 196, 261
          Agricultural buildings  296–298, 405         Calculation assistances  49
          Air-termination conductor  69, 71–73, 75–76, 79, 82–83, 87, 165,   Calculation of L 0  and C 0   257
             167, 417                                  Cathode  142–144, 146–148
          Air-termination rod  52, 66–67, 69–70, 73–74, 78, 82–85, 90–93,   CCTV systems  300–302, 428
             101, 103, 110–111, 113–114, 150–151, 154–155, 165–166,   Cell sites  106, 157, 355–358
             293, 302, 365, 368–369, 377, 411–413, 417, 446, 452–453  Charge  15, 17, 20–21, 23, 25, 64, 144, 218
          Air-termination rod height  55, 67, 69, 92, 167  Chimneys  28, 73–74, 81, 90
          Air-termination system  10, 52–53, 61, 63, 66–75, 77–87, 89,   Churches  87–88, 155, 403
             93–95, 97, 99–101–104, 107–108, 113, 149, 151–152, 159,   Class of LPS  9–10, 25, 27, 36–37, 55, 58, 61, 64–70, 72–75, 77–78,
             165, 167, 181, 276–278, 293, 302, 306, 343–345, 356, 375,   82–83, 86–88, 89, 95–96, 99, 101, 127, 131, 140, 149–150,
             377–378, 394, 411–413, 417, 420, 438          153–154, 180, 202, 276, 286–287, 344–345, 363–366, 375,
          Air-termination system for green and flat roofs  82  380, 393–394, 413, 437–438, 451
          Air-termination system for steeples and churches  87  Classification into explosion groups  257
          Air-termination system for thatched roofs  71, 78–81, 107  Cloud-to-earth flash  15–16, 25
          Air-termination system for wind turbines  88, 345  Combination of earth electrodes  123
          Air-termination system with many air-termination tips  77  Combined arrester  181, 204–207, 210–212, 214, 218, 239–240,
                                                           249–251, 272, 280–281, 283, 287, 302, 311, 314, 327, 340,
          Air-termination systems for buildings with flat roofs  75  351, 356, 359, 366, 371, 380–381, 394, 397–399, 405, 424,
          Air-termination systems for buildings with gable roofs  73  427, 453, 455
          Air-termination systems on metal roofs  76–78  Common-mode interference  249, 252, 255,
          Air-termination tip  77, 109, 276–277, 356, 394, 447, 453  Competent person  55
          Angled support for an air-termination rod  85  Components for thatched roofs  79
          Anode  142–147                               Components for the external lightning protection system of a
          Antenna  74, 107, 355, 397–398                   residential building  114
          Antenna system  182, 292–294, 356            Concentration cell  144–145, 174
          Area of the air-termination rod exposed to wind  91  Condition of the earth-termination system  57
                                                       Conductor holders for flat roofs  75
          Aspects to be observed for the installation of SPDs  260
                                                       Conductor holders for ridge tiles  115–116
          B                                            Conductor materials  22, 96
          Backup fuse  218, 221, 227, 235–236, 239–241, 243, 249, 427  Cone-shaped protected volume  68
                                                       Configuration of air-termination conductors, air-termination rods,
          Backup protection  240                           earth entry rods and down conductors  110
          Bare copper  147–148, 174                    Connecting cable lengths  234 236–238, 243
          Biogas plant  109, 275–276, 279–281          Connection set for safety rope systems  94–95
          Black tank  135                              Continuity of the connections  57
          BLITZDUCTOR  182–184, 198, 205, 209, 244–245, 247–251, 253,   Conventional earthing impedance  119, 125, 127
             257–261, 263–264, 268, 280, 282, 286–289, 297, 302, 311,   Coordination  12, 190, 206, 210–214, 219, 229, 253, 356, 358, 360,
             326–327, 332, 349–352, 358, 368, 370–372, 378, 382–383,   367, 427, 442–443
             398, 433, 440, 442, 454                   Coordination of the protection measures 210
          Break resistance  91–92                      Copper sulphate electrode  143–146
          Break resistance of the air-termination rod  91  Corrosion  11, 29, 96, 106, 133, 140, 143–147, 149, 168, 174, 346,
          Building management systems  253                 376, 453
          Burglar alarm systems  309                   Corrosion cell  143, 146
          Buried connection points  149                Corrosion of earth electrodes  142–149



          482  LIGHTNING PROTECTION GUIDE                            www.dehn-international.com
   478   479   480   481   482   483   484   485   486   487   488