Page 71 - Sace Emax 2 Catalogue
P. 71

SOFT WARE FUNCTIONS                                                               4/7





















                           Space saving                                    - ATS unit manages only two sources, without
                           •  No other Programmable Logic Controllers (PLC)   interlock, logic programming and wiring con-
                            are needed as Emax 2 has embedded the intelli-  nections for the third circuitbreaker with less
                            gence to realize the load shedding logics, taking   time required for installation.
                            advantage of the current and voltage sensors
                            for electrical parameter measurements.     Ease of use                                     04
                           •  In addition, static converters for low voltage   •  Load shedding logics are generally set with high
                            photovoltaic production have typically anti-is-  engineering skills and customization effort with
                            landing protections: this implies another power   devices as programmable logic controllers.
                            deficit to be added to the main grid contribu-  •  Emax 2 guarantees easy installation thanks to
                            tion during the Microgrid islanding. Emax 2 is   predefined templates and the user-friendly
                            the first circuit breaker that estimates solar   graphic interface in the SW commissioning tool.
                            production without additional sensors.
                           •  Load Shedding is suitable with ATS architec-  For further information, please refer to the White
                            tures like Main-BusTie-Gen used to distinguish   Paper “Emax 2, all-in-one innovation – Load Shed-
                            priority/not priority loads.               ding” (1SDC007119G0201).
                            Where feasible, BusTie switching device is not
                            required anymore and this means:
                               - Significant space and material saving up to
                              50% in the power distribution switchgear for
                              panel builders.
                               - Load Shedding is self-tuned with the specific
                              power unbalance identification and dynami-
                              cally choses the controllable loads to be shed,
                              reducing constraints for consultants during
                              plant design.
          —
          Typical load shed-
          ding application



                                Gen                                                            PV
                                 Set                                                          Plant



                                                                                                 –





                              LINE 1  OFFICIES                LINE 2                   WAREHOUSE      POWER
                                                                                                      FACTOR
                                                                                                      CONNECTION









                                                M     M     M
                                               3     3     3
                                            ASYNCHRONOUS MOTOR  LIGHTING  SOCKET  LIGHTING   HVAC
   66   67   68   69   70   71   72   73   74   75   76