Page 57 - Sace Emax 2 Catalogue
P. 57

PROTECTION TRIP UNITS                                                            3/33

          t

               I7

                     t7
                       I


          t  steady
             state  start-up
          t

               I7
                       I
                     t7                                                                                                03
                       I   Neutral protection: available at 50%, 100% or 200% of the phase currents, or disabled, it is applied to
          t  50% 150%
             100% 200%
                 L         the overcurrent protections L, S and I.
          t  steady
                    S
             state  start-up
                       I
                       I

                       I
          t                Instantaneous Earth Fault (G-ANSI 50N): with trip curve without instantaneous delay.
          t
          t  100% 200%
            I4 150%
            50%
               I4  L
                t4
                    S
                       I I
                       I
          t            I
               I3          Earth fault on toroid (G ext - ANSI 51G & 50GTD): with trip time independent of the current (t = k) or with
          t
                           constant specific let-through energy (t = k/l ). Pre-alarm that 90% threshold has been reached permits
                                                              2
                           the fault to be reported to supervision systems without interruption of continuity. The protection uses
            I4
                t4     I   the external toroid installed, for example, on the star centre of the transformer, and is an alternative to
                           the G and Rc functions. The function is active with an auxiliary supply.
          t            I

          t
            I2
          t     t2         Modified Differential Ground Fault (MDGF): Available with the trip time independent of the current
               I3          (t = k) or constant specific let-through energy (t = k/l ). This protection function is designed for systems
                                                                     2
               I7      I   with solidly grounded multi-source ground fault schemes (refer to instruction manual 1SDH001330R005).
                           The complete equipment level solution includes third-party phase current transformers, summing cur-
                    t7 I   rent transformers, and a dedicated terminal (please refer to 1SDA114800R1 or 1SDA114798R1).
          t
             I1        I
          t      t1
                           Start-up function: enables protections S, I and G to operate with higher trip thresholds during the
          t  steady
             state  start-up  starting phase, avoiding untimely trips due to high inrush currents of certain loads (motors, transform-
            I2
                t2     I   ers, lamps). The starting phase lasts 100 ms to 30 s and is recognized automatically by the trip unit:
                           •  at the closing of the circuit breaker with a self-supplied trip unit;
                       I   •  when the peak value of the maximum current exceeds the set threshold (0.1…10 x In) with an externally
                       I    supplied trip unit; a new start-up is possible after the current falls below the threshold.
          t
             I1
          t  50% 150% t1
             100% 200%
                 L
          t        S       Current unbalance (IU – ANSI 46): with constant trip time (t = k), protects from an unbalance between
                           the currents of the single phases protected by the circuit breaker.
               I7     I I
                       I
                    t7
                       I
          t

          t  steady
            I4 state  start-up
                t4
                       I

          t            I

               I3
          t  50% 150%
             100% 200%
                 L
                   S
                       I
                      I
          t            I


          t  I2
                t2
            I4         I
                t4

          t            I
             I1
          t      t1
               I3
                       I

                       I

          t


            I2
                t2
                       I


          t
             I1
                 t1



                       I