Page 68 - 35_DS702_E_2014_Lightning_Protection_Guide
P. 68

air-termination                       d          Sag of the rolling sphere
                   conductor    r                     Distance  Class of LPS with rolling sphere radius [m]
                                                                        [m] (rounded up)
           penetration depth p                       the air-ter-  (20 m)  (30 m)  (45 m)  (60 m)
                                                      between
                                                                                 III
                                                                          II
                                                                                          IV
                                                                  I
                                                      mination
                                                      rods [m]
                                          ∆h
                                                                0.10
                                                         4 2    0.03     0.02    0.01    0.01
                                                                         0.07
                                                                                         0.03
                                                                                 0.04
                                                         6      0.23     0.15    0.10    0.08
                            d                            8      0.40     0.27    0.18    0.13
                                                        10      0.64     0.42    0.28    0.21
       Figure 5.1.1.7  Penetration depth p of the rolling sphere  12  0.92  0.61  0.40   0.30
                                                        14      1.27     0.83    0.55    0.41
                                                        16      1.67     1.09    0.72    0.54
                                     Class of LPS       18      2.14     1.38    0.91    0.68
                                     I  II  III IV      20      2.68     1.72    1.13    0.84
                      r           r 20 30 45 60         23      3.64     2.29    1.49    1.11
                                                        26      4.80     2.96    1.92    1.43
                                                        29      6.23     3.74    2.40    1.78
                                                        32      8.00     4.62    2.94    2.17
                                                        35      10.32    5.63    3.54    2.61
                                        d           Table 5.1.1.2  Sag of the rolling sphere in case of two air-termina-
        p
                                 ∆h                           tion rods or two parallel air-termination conductors
              rectangular protected
              volume between four
              air-termination rods
                                                    does not “roll on rails” but “sits deeper” instead, thus increas-
       Figure 5.1.1.8  Air-termination system for roof-mounted structures
                and their protected volume          ing the penetration depth of the sphere (Figure 5.1.1.8).
                                                    The  height  of  the  air-termination  rods  Δh  must  always  be
                                                    greater than the value of the penetration depth p determined,
                                                    and hence greater than the sag of the rolling sphere. This addi-
                                                    tional height of the air-termination rod ensures that the rolling
                       d  diagonal                  sphere does not touch the object to be protected.

                                                    Another way of determining the height of the air- termination
                                                    rods is to use Table 5.1.1.2. The penetration depth of the
                                                    rolling sphere is governed by the largest distance of the air-
                                                    termination rods from each other. Using the greatest distance,
                                                    the penetration depth p (sag) can be read off from the table.
                                                    The air-termination rods must be dimensioned according to the
                                                    height of the roof-mounted structures (in relation to the loca-
                                         ∆h         tion of the air-termination rod) and also the penetration depth
                  domelight
               installed on the roof                (Figure 5.1.1.9).
                                                    If, for example, a total air-termination rod height of 1.15 m is
       Figure 5.1.1.9  Calculation of Δh for several air-termination rods   either calculated or obtained from the table, an air-termination
                according to the rolling sphere method  rod with a standard length of 1.5 m is normally used.



            www.dehn-international.com                              LIGHTNING PROTECTION GUIDE  67
   63   64   65   66   67   68   69   70   71   72   73