18 ABB ARC GUARD SYSTEM™ – TVOC-2 INSTALLATION AND MAINTENANCE GUIDE
4.1 Introduction List of contents
Check the contents in this package as follow:
This chapter describes how to install the Arc Monitor and • Arc Monitor
set up the system. Also in this chapter are examples in
placing detectors and general information concerning • Connection cable 3 meter (118 inch) for external Human
the products. Machine Interface, HMI
Installation of Arc Monitor is performed in steps. After • Plastic nut for mounting external HMI
finishing one step you proceed to the next one. The
sequence is mandatory. • Sealing for mounting external HMI
• Label for covering HMI contact on Arc Monitor, (only if
external HMI is used)
INFORMATION • Quick installation guide
The Arc Monitor has 10 detector inputs. If your
system needs more inputs then you will need
to use additional extension modules. INFORMATION
This package is a basic start kit. If you need
4.2 Installation procedure more according for your system needs then
04
contact your local supplier.
WARNING
Intermediate storage
The reader should have knowledge and follow
the applicable safety laws and standards as Until the Arc Monitor is mounted it should be stored in its
well as local safety instructions. original package.
Installation procedure consists of the following five steps:
• Getting started
• Mounting
• Connecting electrical connections
• Configuration
• Testing and verification
Tools required
To mount the Arc Monitor the following tools are required:
• Screwdriver, 2.5 x 0.6 mm (0.98 x 0.23 inch)
• Phillips screwdriver 4.3/2
• Drill 5 mm (0.196 inch), in case of wall mounting.
4.2.1 Getting started
This section describes instructions how to receive and
check the Arc Monitor.
Do the following steps:
Receiving and checking
1. Turn the package with the correct side up.
2. Remove the transport casing.
3. visually inspect the Arc Monitor.
4. Check that all items are included, according to the
delivery document.