Page 178 - B_ELSB_Cat_2022_01_MCBs
P. 178

1/178            ELECTRICAL INSTALL ATION SOLUTIONS FOR BUILDINGS - TECHNICAL DETAILS   9AKK 107991 A8329
  1



          —
          MCBs technical details
          Coordination tables: selectivity




          Discrimination of S750 DR with respect to downstream MCB S200 / S400 compared to fuse protection
          MCBs
                                                                                               S 200 /
                                                                                               S 400
                    supply side:     S 750 DR                               fuse
          final     Char.            E / K                                  gG
          circuit:
                          I [kA]     25
                          cu
                                 I  [A]  16  20  25  32  40  50  63  80  100  16  20  25  35  40  50  63  80 100
                                 n
          S 200     Z     6       ≤ 2  10  10  10  10  10  10  10  10  10    0.5  2   6   6   10  10  10  10  10
          S 400 E
                                   3  10  10  10  10  10  10  10  10  10     0.3  0.7  1.8  6  10  10  10  10  10
                                   4  10  10  10  10  10  10  10  10  10     0.3  0.6  1.3  3.5  4  7  10  10  10
                                   6  10  10  10  10  10  10  10  10  10     0.2  0.5  0.9  1.3  2.7  3.8  6  10  10
                                   8  10  10  10  10  10  10  10  10  10         0.4  0.6  1.3  1.5  2.4  4  6  6
                                  10  10  10  10  10  10  10  10  10  10         0.4  0.6  1.3  1.5  2.4  4  6  6
                                  16      10  10  10  10  10  10  10  10             0.5  1.1  1.5  1.7  3  4.5  6
                                  20          10  10  10  10  10  10  10                     0.7  1.4  2  3  4.4
                                  25              10  10  10  10  10  10                     0.7  1.4  2  3  4.4
                                  32                  10  10  10  10  10                              2   3   4
                                  40                      10  10  10  10                              2   3   4
                                  50                          10  10  10                                      3
                                  63                              10  10                                      3

                          Limited overload selectivity
   173   174   175   176   177   178   179   180   181   182   183