Page 369 - 35_DS702_E_2014_Lightning_Protection_Guide
P. 369

GJB                  6 mm 2 2  Cu
                                              GJB
                                                                   6 mm  Cu
                               PC
                               PC                 =  ~





                                                                    DNO  Distribution network operator
                              M M                                  GJB  Generator junction box
                  DNO                                                M Meter
                         SEB                                        MEB  Main earthing busbar
                                              MEB                    SEB  Service entrance box





          No. in Fig.                               SPD               * FM = Floating remote signalling contact  Part No.
          d.c. input of the inverter
                    Per MPPT                        DEHNguard DG M YPV SCI 1000 FM *       952 515
                    For 1 MPPT                      DEHNcube DCU YPV SCI 1000 1M           900 910
                    For 2 MPPTs                     DEHNcube DCU YPV SCI 1000 2M           900 920
          a.c. output of the inverter
                    TN-S system                     DEHNguard DG M TNS 275 FM *            952 405
          Low-voltage input
                    TN-C system                     DEHNguard DG M TNC CI 275 FM *         952 309
                    TN-S system                     DEHNguard DG M TNS CI 275 FM *         952 406
                    TT system                       DEHNguard DG M TT CI 275 FM *          952 327
          Data interface
                    Two pairs, even with different operating   BLITZDUCTOR BXTU ML4 BD 0-180  920 349
                    voltages up to 180 V            + BXT BAS base part                  + 920 300
          Functional earthing
                    Functional equipotential bonding  UNI earthing clamp                   540 250
          Figure 9.18.12   Building without external LPS – situation A (Supplement 5 of the DIN EN 62305-3 standard)



          368  LIGHTNING PROTECTION GUIDE                            www.dehn-international.com
   364   365   366   367   368   369   370   371   372   373   374